This project consisted of design, supply and install basal lining system and an insulated modular floating cover for two large raw water storage ponds. A MLDS (mobile leak detection system) survey was carried out before the lagoon was filled. The cover was installed dry, immediately after the basal lining was tested.
Project Details
Client
Energy Resources
Location
South Gobi Outer Mongolia
Further Information
- Main Contractor: FLI International Ltd
- CQA: Int.
- Design Consultant: Aquaterra
- Membrane Manufacturer: Solmax
- Insulated Panel Manufacture: Lemna
- Supply & Installation: FLI International Ltd
Materials:
- 2.5mm HDPE 32,500m2
- Insulated floating cover 24,000m2
Personnel
- Installation crew of 14 people
- 1 Site manager (FLI)
- 5 Skilled Technicians
- 8 Local labourers
Programme
FLI took 12 weeks to complete this project. We were working in the middle of the Gobi desert and had to be totally self sufficient with equipment and material.