Case Studies

All Case Studies

Farleigh Anaerobic Digestion Facility

Our E.P.C. wrapped delivery for this project encompasses a broad scope of activities...

Anaerobic Digestion - Crows Hall Farm

  • Processing capacity 30,000tpa
  • 2 x 2,000m3 primary digesters
  • 1 x 1,...

Bath Western Riverside

Bath Western Riverside is a major mixed use redevelopment in Bath. The proposed scheme...

Former Pesticide Factory

Large former manufacturing facility for herbicides and pesticides resulting in significant...

Nickel Ore Mining

Supply and installation of 1.5mm LLDPE for lining of residue storage facility.  Goro Nickel...

Coal Mine Raw Water Storage Ponds

This project consisted of design, supply and install basal lining system and an insulated...