Former Pesticide Factory

Large former manufacturing facility for herbicides and pesticides resulting in significant soil and groundwater contamination. Site occupied a sensitive location adjacent to a major river of significant local importance, also located within a village setting with close neighbouring residential properties. VertaseFLI was chosen as remediation contractor on this high profile, very contentious Part 2A project because of extensive experience working on similarly challenging projects. The site was subject to local opposition and national media coverage even before remediation works commenced.

Project Details

Client

Harrow Estates plc

Location

Hauxton, Cambridge

Further Information

Reviewing and updating existing site investigation and risk assessment targets based on extensive research and gathering of site specific data, involving extensive discussions with a number of stakeholders. Following demolition of the main buildings including the removal of notifiable asbestos, VertaseFLI undertook a comprehensive survey of the factory waste water treatment plant (WWTP) including large storage and bio filter tanks. This plant had to be maintained and operated throughout and after the remediation works as part of an ongoing de-watering requirement. This was in addition to the temporary WWTP required for day-to-day activities.

Contaminants on the site were primarily chlorinated solvent based, some volatile and highly odorous. Strict management of staff safety and impact to the local community was necessary, including reduced working areas, covering working faces, covered and forced vented windrows, operating within former buildings and operating odour neutralising equipment directly on odours operations and as a perimeter misting spray.

Ex-situ bioremediation was used at its limits especially considering the required environmental management. Risk Assessments and targets were constantly reviewed as new and unforeseen contaminants were detected. Numerous UST’s and large amounts of redundant buried pipework (some lagged with asbestos) were present and required de-commissioning. Demolition produced 40,000m3 of recycled aggregates. Over 150,000m3 of soil were treated for reuse.

SERVICES PROVIDED

  • Review of risk assessments
  • Demolition
  • Enhanced bioremediation
  • Pump and treat
  • Extensive public liaison – multi agency group